ABB 3BHL000734P0003 Ensures 99.99% Reliability for German Wastewater Treatment Plant
Bocholt, Germany – November 2025 – Bocholt Municipal Wastewater Treatment Plant (WWTP), which serves over 100,000 residents and 500 local businesses, has successfully deployed ABB 3BHL000734P0003 Control Modules to upgrade its process control system. The
01-07
ABB 3BHL000734P0003 Boosts Energy Efficiency by 18% at BMW’s Oxford EV Plant
Oxford, UK – December 2025 – BMW Group’s Mini production facility in Oxford, a key hub for electric vehicle (EV) manufacturing, has successfully deployed ABB 3BHL000734P0003 Control Modules to upgrade the control systems of its paint shop and battery asse
01-07
ABB 3BHL000734P0003 Cuts Downtime by 52% in BASF’s Colombian Chemical Plant
Bogotá, Colombia – January 2026 – Amtex, Latin America’s largest producer of carboxymethylcellulose (CMC) and a key supplier to the food, pharmaceutical, and textile industries, has successfully deployed ABB 3BHL000734P0003 Control Modules to upgrade its
01-07
ABB DKTFM418B 3BHB015651P0001 Boosts Renewable Energy Integration by 40% at German Wind Farms
Hamburg, Germany – November 2025 – EnBW Energie Baden-Württemberg, one of Germany’s leading energy companies, has successfully deployed ABB DKTFM418B 3BHB015651P0001 Thyristor Triggering Modules to upgrade the power conversion systems of 25 wind farms acr
01-07
ABB DKTFM418B 3BHB015651P0001 Ensures 99.99% Power Stability for Saudi Aramco’s Oil Refineries
Dhahran, Saudi Arabia – December 2025 – Saudi Aramco, the world’s largest integrated oil and gas company, has successfully deployed ABB DKTFM418B 3BHB015651P0001 Thyristor Triggering Modules to upgrade the power control systems of 6 oil refineries across
01-07
ABB DKTFM418B 3BHB015651P0001 Cuts Energy Losses by 38% at POSCO’s Steel Smelting Plant
Pohang, South Korea – January 2026 – POSCO, one of the world’s leading steel producers, has successfully deployed ABB DKTFM418B 3BHB015651P0001 Thyristor Triggering Modules to upgrade the power control systems of 8 electric arc furnaces (EAFs) at its Poha
01-07
ABB O4LE 1KHL015545R0001 Ensures 99.99% Control Reliability for Water Treatment Plants in Barcelona
Barcelona, Spain – November 2025 – Aigües de Barcelona, the leading water utility company serving the Barcelona metropolitan area, has successfully deployed ABB O4LE 1KHL015545R0001 PCB Card Modules to upgrade the control systems of 8 water treatment plan
01-06
ABB O4LE 1KHL015545R0001 Enhances Container Handling Efficiency by 25% at Hamburg Port
Hamburg, Germany – December 2025 – The Hamburg Port Authority (HPA) has successfully deployed ABB O4LE 1KHL015545R0001 PCB Card Modules to upgrade the control systems of 30 automated container cranes at its Container Terminal Tollerort. The deployment, pa
01-06
ABB O4LE 1KHL015545R0001 Reduces Downtime by 62% for ArcelorMittal’s Steel Rolling Mills
Ghent, Belgium – January 2026 – ArcelorMittal, the world’s leading steel and mining company, has successfully deployed ABB O4LE 1KHL015545R0001 PCB Card Modules to upgrade the control systems of 12 steel rolling mills at its Ghent production facility. The
01-06
ABB DSAI146 3BSE007949R1 Ensures 99.99% Signal Reliability for Iberdrola’s Solar Power Plants
Seville, Spain – October 2025 – Iberdrola, one of Europe’s leading renewable energy companies, has successfully deployed ABB DSAI146 3BSE007949R1 Analog Input Modules to upgrade the signal acquisition system of 15 utility-scale solar power plants in south
01-06
ABB DSAI146 3BSE007949R1 Enables 28% Efficiency Boost for Volkswagen’s Automated Welding Lines
Wolfsburg, Germany – November 2025 – Volkswagen Group has completed the deployment of ABB DSAI146 3BSE007949R1 Analog Input Modules to upgrade the signal acquisition system of 50 automated welding lines at its Wolfsburg manufacturing plant. The deployment
01-05
ABB DSAI146 3BSE007949R1 Cuts Measurement Errors by 96% for BASF’s Chemical Synthesis Processes
Ludwigshafen, Germany – December 2025 – BASF SE, the world’s leading chemical producer, has successfully deployed ABB DSAI146 3BSE007949R1 Analog Input Modules across 20 high-precision chemical synthesis lines at its flagship Ludwigshafen industrial park.
01-05
ABB DSAI146 3BSE007949R1 Cuts Measurement Errors by 96% for BASF’s Chemical Synthesis Processes
Ludwigshafen, Germany – December 2025 – BASF SE, the world’s leading chemical producer, has deployed ABB DSAI146 3BSE007949R1 input modules across 20 high-precision chemical synthesis lines at its Ludwigshafen industrial park. The deployment, completed in
01-05
ABB REM543 Cuts 40% of Power-Related Downtime for BASF’s Ludwigshafen Industrial Park
Ludwigshafen, Germany – November 2025 – BASF SE, the world’s largest chemical producer, has deployed ABB REM543 control devices across its 10 km² Ludwigshafen industrial park, reducing power-related unplanned downtime by 40% and improving power quality fo
01-05
ABB REM543 Ensures 99.99% Power Reliability for Amazon AWS’s Frankfurt Data Center
Frankfurt, Germany – December 2025 – Amazon Web Services (AWS) has deployed ABB REM543 control devices to manage the critical power distribution system of its flagship Frankfurt data center, achieving 99.99% power reliability—equating to just 4.38 hours o
12-31
ABB REM543 Powers 35% Reduction in Outage Time for Stockholm’s Smart Grid Upgrade
12-31
ABB 1SVR011718R2500: High-Precision Signal Conversion for Harsh Chemical Environments
The ABB 1SVR011718R2500 Analog Signal Converter was selected for its advanced EMI filtering, broad signal compatibility, low transmission latency, and industrial-grade durability. Key features addressing BASF’s challenges include:
12-31
ABB 1SVR011718R2500: Reliable Signal Conversion for Renewable Energy Applications
The ABB 1SVR011718R2500 Analog Signal Converter was selected for its long-distance signal transmission capabilities, temperature stability, environmental resistance, and smart grid compatibility. Key features addressing Enel’s challenges include:
12-31
ABB 1SVR011718R2500 Optimizes HVAC Efficiency by 28% for Berlin’s Iconic Alexanderplatz Tower
Berlin, Germany – November 2026 – The Alexanderplatz Tower, one of Berlin’s most famous skyscrapers, has achieved a 28% reduction in HVAC energy consumption and a 40% improvement in indoor climate control accuracy after deploying the ABB 1SVR011718R2500 A
12-30
ABB CP676 3ABD00038801 HMI Enhances Operational Reliability for Munich’s Wastewater Treatment Plant
Munich, Germany – August 2026 – Munich’s main wastewater treatment plant (WWTP) has achieved a 35% reduction in maintenance costs and a 99.9% operational reliability rate after deploying the ABB CP676 3ABD00038801 Human-Machine Interface. The upgrade, com
12-30
ABB CP676 3ABD00038801 HMI Optimizes Warehouse Operations for DHL Supply Chain’s Frankfurt Facility
Frankfurt, Germany – July 2026 – DHL Supply Chain’s Frankfurt logistics center has achieved a 32% reduction in order processing time and a 25% increase in inventory accuracy after implementing the ABB CP676 3ABD00038801 Human-Machine Interface. The deploy
12-30
ABB CP676 3ABD00038801 HMI Boosts Automotive Production Efficiency by 28% for Volkswagen’s Wolfsburg
Wolfsburg, Germany – June 2026 – Volkswagen Group’s flagship Wolfsburg manufacturing plant has achieved a 28% increase in production line efficiency and a 40% reduction in unplanned downtime after deploying the ABB CP676 3ABD00038801 Human-Machine Interfa
12-30
ABB REX521GHHGSH51G Control Device Maximizes Solar Energy Yield by 18% for BayWa r.e. in Brandenburg
Brandenburg, Germany – August 2032 – BayWa r.e., a global leader in renewable energy solutions, has achieved an 18% increase in solar energy yield and a 25% reduction in maintenance costs at its 500 MW Brandenburg solar farm after deploying the ABB REX521
12-29
The Challenge: Aging Distribution Infrastructure Jeopardizes Urban Power Reliability
After evaluating solutions from Siemens Energy and Schneider Electric, SWM selected the ABB REX010 HESG324426R0001 distribution system for its advanced fault monitoring, modular design, renewable energy integration capabilities, and load management featur
12-29
The Challenge: Unreliable Power Distribution Risks Data Center Operations
Equinix’s FR5 data center is one of Europe’s largest, with 100,000 sq ft of data hall space and a power capacity of 200 MW. The facility supports cloud computing, financial transactions, and enterprise data storage, requiring uninterrupted power supply to
12-29
ABB REX010 HESG324426R0001 Cuts Industrial Park Energy Costs by 35% for Hannover Messe Park
Hannover Messe Park spans 20 km² and houses companies specializing in automotive manufacturing, industrial automation, and precision engineering. The park’s legacy distribution system, installed in the 1990s, supplied power to 300+ industrial facilities w
12-29
The Challenge: Unreliable Industrial Power Supply Disrupts Production
BASF’s Ludwigshafen complex is the world’s largest chemical production site, covering 10 km² and employing 39,000 people. The complex relies on a dedicated 110 kV industrial to power critical production processes (e.g., chemical synthesis, distillation, p
12-29
The Challenge: Unstable Grid Integration Limits PV Plant Performance
First Solar’s Andalusia PV plant is one of Europe’s largest, generating enough clean energy to power 180,000 households annually. The plant relies on control relays to manage the integration of PV-generated electricity into the grid, ensuring compliance w
12-26
ABB REC670 Control Relay Cuts Industrial Power Outages by 78% for BASF in Ludwigshafen
Munich, Germany – December 2031 – Siemens Energy, a global leader in energy technology, has achieved an 82% reduction in unplanned substation outages and a 35% decrease in maintenance costs at its Bavaria 220 kV substation after deploying the ABB REC670 c
12-26
The Challenge: Outdated Communication Modules Hinder Smart Factory Operations
Bosch’s Stuttgart factory specializes in the production of industrial sensors and automotive electronic components, operating 18 fully automated production lines integrated with 3,000+ IoT devices. The factory relies on real-time data exchange between PLC
12-26